CONSTRUCTION TIMELINE

Wellfield Construction Wellfield Pre-conditioning
Plant & Infrastructure Construction First Production
jan grey
2019 CONSTRUCTION SCHEDULE
PIPELINE CORRIDOR
PIPELINE CORRIDOR
SAFETY WARNING
START OF JACK & BORE METHOD OF HORIZONTAL BORING TO CONNECT PIPELINE UNDER THE HIGHWAY
WELLFIELD DRILLING
 
feb
2019 CONSTRUCTION SCHEDULE
30 INCH PIPE FABRICATION FUSING
ACID STORAGE AREA CONSTRUCTION
ACID TANK FOUNDATION EXCAVATION
DRAINDOWN POND EXCAVATION
NEW PAVED ACCESS ROAD
PIPEBRIDGE AREA
Pipeline Corridor to Jack and Bore
PIPELINE DRAIN DOWN POND
PIPELINE CORRIDOR 1
PIPELINE CORRIDOR 2
PLS POND CONSTRUCTION
PIPE FABRICATION THE NEW PIPELINE WILL CONNECT THE WELLFIELD TO THE JCM PROCESSING FACILITY
TRUCK SHOP OUTSIDE VIEW
mar
2019 CONSTRUCTION SCHEDULE
Concrete Pour Acid Tank Storage 1
Concrete Pour Acid Tank Storage 2
Gunnison Evaporation Pond Construction
Gunnison PLS Pump Foundation Stage 1
Gunnison PLS Pump Foundation Stage 2
PLS Vertical Pump Wells 1
PLS Vertical Pump Wells 2
Acid Storage Foundations
Balance Pipe Connecting Raffinate and ILS (Intermediate Leach Solution) Ponds
Pipebridge Foundation 030819
Cuttings from recent production well drilling
Production well. The pylon in the far background is marking an existing well.
Pipeline bridge. The two large holes are for raffinate and mining solutions; one of the smaller holes is for recylced water, one is for utilities, and there are three spares
 
apr grey
2019 CONSTRUCTION SCHEDULE
Footing for new retaining wall - lower tank farm
Footing for new retaining wall - lower tank farm (2)
69kV Powerline Installation
Acid Storage Tanks Progress 1
Acid Storage Tanks Progress 2
Acid Storage Tanks Progress 3
Acid Tank Construction Progress April 10
Raff Pump Well Foundations
Acid Storage Tank Progress
SX Control Valves
Tank Farm Retaining Wall
Wellfield Drilling April 12
Jack & Bore - 1st piece of 54 inch casing 1
Jack & Bore - 1st piece of 54 inch casing 2
Acid Storage Tanks April 18
JCM Raffinate Pond Progress April 18
JCM Raff Pond Progress April 18 2
Power Line Installation April 18
Acid Unloading Pad 042419
Evaporation Pond - 210,000 Cubic Yards Excavated
Evaporation Pond Progress 042419
PLS Pond Progress 042419
 
mar
2019 CONSTRUCTION SCHEDULE
PLS Pond Progress start of lining May 3
Crud treatment area May 8
SX Tank Farm Expansion May 8
Pipe Bridge Progress May 14 2019 1
Pipe Bridge Progress May 14 2019 2
Pipeline Bridge Progress May 14 2019 3
May 15 2019 PLS Pond Progress
May 17 Pipeline Progress
May 17 Pipeline Progress 2
May 22 Pipeline Progress 1
May 22 Pipeline Progress 2
May 22 Pipeline Progress 3
 
mar
2019 CONSTRUCTION SCHEDULE
Acid Tank with roofs
JCM Pond Modifications June 2019
Transformer Set at Gunnsion June 10 2019
Transformer Set June 10 2019
Evaporation Pond - Liner 2 June 13 2019
Evaporation Pond - New Liner June 13 2019
 
mar
 
mar
 
mar
 
mar
 
mar
 
mar
 

To view images of the mine construction process, click on the timeline.

Wellfield Construction

jan grey
2019 CONSTRUCTION SCHEDULE
PIPELINE CORRIDOR
PIPELINE CORRIDOR
SAFETY WARNING
START OF JACK & BORE METHOD OF HORIZONTAL BORING TO CONNECT PIPELINE UNDER THE HIGHWAY
WELLFIELD DRILLING
 
feb
2019 CONSTRUCTION SCHEDULE
30 INCH PIPE FABRICATION FUSING
ACID STORAGE AREA CONSTRUCTION
ACID TANK FOUNDATION EXCAVATION
DRAINDOWN POND EXCAVATION
NEW PAVED ACCESS ROAD
PIPEBRIDGE AREA
Pipeline Corridor to Jack and Bore
PIPELINE DRAIN DOWN POND
PIPELINE CORRIDOR 1
PIPELINE CORRIDOR 2
PLS POND CONSTRUCTION
PIPE FABRICATION THE NEW PIPELINE WILL CONNECT THE WELLFIELD TO THE JCM PROCESSING FACILITY
TRUCK SHOP OUTSIDE VIEW
mar
2019 CONSTRUCTION SCHEDULE
Concrete Pour Acid Tank Storage 1
Concrete Pour Acid Tank Storage 2
Gunnison Evaporation Pond Construction
Gunnison PLS Pump Foundation Stage 1
Gunnison PLS Pump Foundation Stage 2
PLS Vertical Pump Wells 1
PLS Vertical Pump Wells 2
Acid Storage Foundations
Balance Pipe Connecting Raffinate and ILS (Intermediate Leach Solution) Ponds
Pipebridge Foundation 030819
Cuttings from recent production well drilling
Production well. The pylon in the far background is marking an existing well.
Pipeline bridge. The two large holes are for raffinate and mining solutions; one of the smaller holes is for recylced water, one is for utilities, and there are three spares
 
apr grey
2019 CONSTRUCTION SCHEDULE
Footing for new retaining wall - lower tank farm
Footing for new retaining wall - lower tank farm (2)
69kV Powerline Installation
Acid Storage Tanks Progress 1
Acid Storage Tanks Progress 2
Acid Storage Tanks Progress 3
Acid Tank Construction Progress April 10
Raff Pump Well Foundations
Acid Storage Tank Progress
SX Control Valves
Tank Farm Retaining Wall
Wellfield Drilling April 12
Jack & Bore - 1st piece of 54 inch casing 1
Jack & Bore - 1st piece of 54 inch casing 2
Acid Storage Tanks April 18
JCM Raffinate Pond Progress April 18
JCM Raff Pond Progress April 18 2
Power Line Installation April 18
Acid Unloading Pad 042419
Evaporation Pond - 210,000 Cubic Yards Excavated
Evaporation Pond Progress 042419
PLS Pond Progress 042419
 
mar
2019 CONSTRUCTION SCHEDULE
PLS Pond Progress start of lining May 3
Crud treatment area May 8
SX Tank Farm Expansion May 8
Pipe Bridge Progress May 14 2019 1
Pipe Bridge Progress May 14 2019 2
Pipeline Bridge Progress May 14 2019 3
May 15 2019 PLS Pond Progress
May 17 Pipeline Progress
May 17 Pipeline Progress 2
May 22 Pipeline Progress 1
May 22 Pipeline Progress 2
May 22 Pipeline Progress 3
 
mar
2019 CONSTRUCTION SCHEDULE
Acid Tank with roofs
JCM Pond Modifications June 2019
Transformer Set at Gunnsion June 10 2019
Transformer Set June 10 2019
Evaporation Pond - Liner 2 June 13 2019
Evaporation Pond - New Liner June 13 2019
 

Wellfield Pre-conditioning

mar
 
mar
 
mar
 

First Production

mar
 
mar
 
mar
 